Dunster House PS 709 Installationshandbuch - Seite 3
Blättern Sie online oder laden Sie pdf Installationshandbuch für Spielgeräte & Spielplatzgeräte Dunster House PS 709 herunter. Dunster House PS 709 16 Seiten.
Preparation for Assembly
To build your Play System you will/may need:
there are some heavy components.
•
2 people -
readily at hand to begin building.
•
Instructions -
•
Gloves -
if you wish to use protective gloves as a precautionary measure.
if you wish to use protective knee pads as a precautionary measure.
•
Knee pads -
check everything is plumb and level.
•
Spirit level -
measure to help identify correct length timbers.
•
Measuring tape -
to safely work at height.
•
A stepladder -
pre-drilling holes for screws.
•
Drill -
•
Screwdriver bit for drill -
•
3 mm, 6mm, 8mm and 10mm drill bit -
•
Socket wrench with 6mm, 8mm, 10mm, 17mm, or adjustable spanner -
assemblies.
to round out any sharp edges or corners.
•
Sandpaper -
TOOLS REQUIRED
there are a lot of screws to screw in.
remember to pre-drill holes for screws.
connecting larger timber
Page 3