Duplo DB-200 Betriebshandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Betriebshandbuch für Bindemaschine Duplo DB-200 herunter. Duplo DB-200 18 Seiten. Perfect binder
Operation Procedures
(A) STARTUP :
1.
Turn ON the power switch of DB-250 as shown.
( where "I" for ON; "O" for OFF )
The heater of DB-250 will automatically heat
the glue to the preset working temperature and
display the status of the heating processes.
• The 4 leftmost spaces of LED: the status of
heating process ( COLD, WARM, or HOT ).
• The 2 rightmost spaces of LED: The elapsed
time of heating.
2.
Start melting the glue.
The status is COLD a nd the elapsed time is one
minute for this example as shown.
3.
Melting glue is processing.
The status is WARM and the elapsed time is 10
minutes for this example as shown.
4.
After heating for a while, the glue temperature
has reached HOT status. The elapsed time is 20
minutes for this example as shown.
5.
When the glue temperature has reached the
working temperature, DB-250 performs the self-
test and stirs the melting glue.
6.
DB-250 is ready for bookbinding and set to
MANUAL mode for your desired operation.
At this moment, the control panel will display
and flash "LOAD BOOK" for your attention.
For binding operations, please refer to the
MANUAL, AUTO and PAD operations.
5