8) MENU OF PLANNING
The working on of every plant always foresees the work times of the automation know-how, the time-break when gate
is open if the automatic closing is trained and.
The planning menu foresees the regulation of 4 principal parameters:
a) Time of work (chapter 8.1 and 8.2)
b) Time-break of work (chapter 8.3)
c)
Pedestrian time-break (chapter .8.4)
WARNING : before entry in the planning menu remove current to the plant and select:
"Dip 10 S2 ON" to entry in the planning menu.
The choice of speed deceleration must be effected before the memorization of the stroke, otherwise a
variation of the speed deceleration following to the memorization involves to repeat the procedure of the first
setting because the times of work and the setting of the reverse changes.
"Dip 9 S2" according to the used motors (ON two motors, OFF one motor),
Shaft models (with or without encoder, with or without limitswitches) S4
AT THE END OF SETTING PUT AGAIN DIP 10 S2 OFF AND FIT THE CONTROL PANEL.
REV 1
REV 2
(red)
The push button PS3 selects the parameter to use for the regulations, and the pushes button PS1s and PS2
are used for the formulation of the values inside every parameter.
The pushes button PS1s and PS2 can also be activated through an external digipad connected to the input
clamps N.O. Open (26-28 PS1s) and to the input clamps N.O. Pedestrian (27-28 PS2s).
IT IS NOT POSSIBLE TO PERFORM THE LEARNING THROUGH THE REMOTE CONTROLE.
The leds L14 (REV 1), L15 (REV 2), L16 (Set) they visualize the type of setting effectued during the regulations.
Short closing impulse during the initial setting phase of the stroke, press the push button PS2 when gate is
closed with an impulse to get a push in closing on the motor M1 and the opening of the electrolock, (this
operation is possible only with elctrical limit switch in closing over-bridge or if it isn't activate), subsequently
with the push button PS1 proceed to the memorization of the times of work.
8.1)
SET THE TIME OF WORK for 1 MOTOR (M1)
(Maximum working time in opening ~ 4 minutes, closing ~ 4 minutes)
REV 1
(red)
REV 1
(red)
REV 1
(red)
Page 6 of 14
It switch on fix red light the led REV 1 pointing out that the control panel is in
the planning menu of the "Time of work."
Follow the chapter. 8.1 if the automation has 1 motor or the chapter 8.2 if it has
two motors.
SET
REV 2
SET
REV 2
SET
(red)
REV 2
SET
The leds will visualize beside the state.
If the gate is not closed hold pressed the key PS2 up to the complete
closing.
If the gate is closed pass over the following point.
The leds will visualize beside the state.
EQ2009 R 1.6 1.8