Abus Vitess Mortise Service-Handbuch - Seite 17
Blättern Sie online oder laden Sie pdf Service-Handbuch für Schlösser Abus Vitess Mortise herunter. Abus Vitess Mortise 20 Seiten.
REFILL OF HOUSINGS
•
Insert the top pins
•
1st and 3rd chamber: hardened steel;
•
2nd and 4th chamber: anti-pick mushroom pins
•
5th and 6th chamber: stainless steel "centering" pins
1st
2nd
Top-Pin: Hardened
Mushroom: Brass
Step 1
•
Insert the springs, introduce the
s-shaped lever from below into the slot
of the charging thorn and push the
springs with the lever into the thorn
Step 4
•
Insert the lever from above into the slot
and push the pins completely into the
housing
3rd
4th
Top-Pin: Hardened
Mushroom: Brass
Step 2
•
Insert the charging thorn into the
housing and remove the lever
Step 5
•
Turn the charging device with the lever
about 45° and remove the lever
•
Push the plastic plug or follower into
the housing until the thorn has been
pushed through completely
5th
6th
Top-Pin: Nickel Silver
Top-Pin: Nickel Silver
Step 3
•
Turn the thorn until the springs drop
audibly into the cylinder housing
Step 6
•
Make sure the plug goes into the
housing with about an angle of 15°.
Housing pins should not be «snap» into
the groove of plug
17