Apollo 7100UL Installationshandbuch - Seite 9
Blättern Sie online oder laden Sie pdf Installationshandbuch für Toröffner Apollo 7100UL herunter. Apollo 7100UL 17 Seiten. Residential & medium duty commercial slide gate operator
STEP 1. Assemble chain bracket with 5/16" U-bolt & hardware to each end of the gate as shown.
Do not tighten at this time.
STEP 2. Align the left chain
bracket slot with the top teeth
of the idler sprocket.
STEP 3. Align the right
chain bracket slot with the
bottom teeth of the main
sprocket.
STEP 4. Tighten all hardware.
CHAIN BRACKET INSTALLATION
Idler Sprocket
Main Sprocket
8