12.Machine does not use for a long time, before defending machine or before changi-
ng bit, please pull out the plug of power source.
13.Cannot stay in the spanner of handling bit bit is above, before starting machine,
ensure that spanner has left bit.
14.Avoid accident start machine. When moving to put through the machine of power
source , cannot put finger on switch. Ensure that before plug is being inserted into
socket, machine switch is in the location that stops.
15.In outdoor manipulator ware, please use the cable of extension line that accords
with safe requirement.
16.In unit process of cargo bandling must notice concentration, do not when excessi-
veness tiredness, after wine, finish drill with the condition of taking medicine to
make tool.
17.The type of generator speed adjustment or gear speed adjustment in work please
select the adaptive bit of appearance, and open speed most quickly, so machine
reach best state. If rig in working process rock , must close machine to inspect the
concentric degree of bit and main shaft , can damage machine otherwise to occur
danger.
18.Pay attention: For your personal benefit, please choose original factory accessory
Is not original factory accessory if choosing , will may produce injury for operator
or the very machine.

PREPARATORY STAGE

Follow the steps to installing and connecting.You can use additional tool .To
complete the following work.
Pay attention: Before joining , must guarantee that the switch of main
computer is in the state that stops.
Step 1: Comparing with the inspection of container load plan, machine and parts
open package, inspect machine in transportation process, whether damage ,
inspection the voltage of building site whether the voltage that shows on nameplate
is consistent, contrast container load plan sees the attachment in package whether is
complete.
Step 2: Power source joins , according to a standard EN61029 and a IEC1029-2 6
of European Union, taking the diamond drilling machine of water schoolwork must
add to pack the protector of leakage of electricity ,the socket of power source must
carry out earthing. It is consistent with these safe rules, our product matches have
packed the protector of leakage of electricity, its function ,including leakage of
electricity are protected untie with under-voltage to deduct. Insert the plug of power
source well after, the switch face plate of the protector of leakage of electricity must
ensure that is in ON ( beginning ) location.Fall if arising voltage drop, the protector
of leakage of electricity will automatic everything breaks , once after voltage normal,
should operate the protector of leakage of electricity again in REST cubes ( reset )
location. The protector of leakage of electricity specified movement current is 30mA.
Pay attention: Quote clean source of water surely , contain grit waiting for until
the water of impurity may damage the water set sealing ring of machine, 3biggest
hydraulic pressure is 3BAR.
5