Cayken SCY-1800 Betriebsanleitung - Seite 4

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Bohrer Cayken SCY-1800 herunter. Cayken SCY-1800 6 Seiten. Core drill

PREPARATION
Please follow the steps below,assemble and connect the core drill machine.You can do this works with tools
attached with the machine.
ATTENTION:You must make sure that the motor's switch is off when connecting up the mains power supply.
Step 1:Unwrap the package,check the machine and accessories according tothe packing
list.Satisfy yourself that the machine has not been damaged in transit.
Check that the normal voltage is the same as the voltage indicated on the rating plate.Check
all the parts according to the packing list.
Step 2:Electrical connection
According the European standard EN 61029-1 and IEC 1029-2-6,the electrical connection of
diamond core drills with water supply must be operated via a residual current device and to
a properly earthed socket.In accordance with these regulations,our products is fitted with an
inline protector mounted in the cord.This contains both RCD protection and under voltage
tripping.The PRCD must be switched on using the ON key after the power plug has been
inserted into the socket outlet.In the event of a voltage drop,the PRCD will switch off and
must then be switched on again once the power supply has been reestablished.The rated
current,i.e. The fault current at which the PRCD switch off,is 30 mA.
ATTENTION:the PRCD must not lie in water.It must be checked for
perfect function at regular inter vals by pressing the TEST key.
Never operate a diamond core drilling machine without PRCD directly from the main system.
STEP 3 water connection.
Use the attached accessries "Quick connector"to connect the water to the water supply system.
ATTENTION:Use only clean water,as dirty water will cause the seals wear very
quickly.Max. Water pressure 3 bar.
Step 4 Safety test
After having switch on the motor starts softly.Press "TEST" button on the PRCD,the motor stop
immediately.Press RESET button on the PRCD to supply electricity again.
ATTENTION:Do not operate the machine if the PRCD goes wrong.

PUTTING INTO OPERATION

1.Select suitable diamond drill bits.
Our products have 4 kinds of thread,only use suitable high quality diamond
tools,use sharp tools and ensure that the diamond segments are sufficiently
larger than the inner and outer diameter of the drill bit tube.Apply waterres-
istant grease to the tool thread so that the tool ca be easily loosened.Ensure
that the radial run out at the diamond segments of the drill bit is no greater
than 1mm(eccentricity.)
21
PROFESSIONAL DRILLING
PUTTING INTO OPERATION
2.Fix the rigs to the working place
Fixing methods:dowel fixing,vacuum fixing,bracing.The most common met-
hod of fixing is dowel fixing.Use metal dowels if at all possible.The diameter
of the dowels must be at least 12mm.With vacuum fixing,ensure there is a
sufficiently great vacuum.Make sure that the sealing ring are not worn out.
Ensure that the rig is only rigid when the sealing ring is relaxed via jack screws
on the base of the rig.
Note: We strongly recommend the use of the expansion bolt is fixed, and as the location of the expan-
sion screwThe column is the best direction to. Due to fixation the consequences of the company does
not assume any responsibility.
三、Start drilling
The rig received related training for professional use, can be achieved in
the rock, concrete, Li QingMaterials such as drilling or coring. Please be sure
to operate in accordance with the operating rules.Through the introduction
of ball valve, adequate water, so that the debris was completely out, if the
slurry mixture filled drillMachine, you will not be able to introduce adequate
water. Please according to the requirements for the bit to feed pressure, or
at the top of the diamond bitMay be polished, so the drilling efficiency will
be greatly reduced. Sometimes, the drill cutter head can be sharpened on SIC
materials.Please note that the bit do not shake, otherwise the matrix above
diamond may fall off.When drilling encountered metal materials, for use in
low speed, and increase the feed pressure. When the card drill, not to open
Open and shut down the machine way loose please immediately shut down the
machine,use a bit of loose wrench around,And carefully remove the drilling
machine.Vertical drilling, must ensure that the special water collecting device,
and strictlyprevent motor inlet. In the course of workIn any interruption, only
need torestart the machine can, but make sure that before the start of the drill
bit in the machine can rotate freely, no Stuck in the hole.

FRICTION CLUTCH

The integrated friction clutch protects operating personnel,the machine and
the tool against high mechanical overloads,please ensure that the release time
of the clutch is not more than 3-4 seconds,because otherwise wear and heat wil
increase rapidly.
22
PROFESSIONAL DRILLING