CBT Supply FIK-19 Installationshandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Installationshandbuch für Inneneinrichtung CBT Supply FIK-19 herunter. CBT Supply FIK-19 16 Seiten. Flipit kit generation ii
STEP 5 -
Positioning Template
for Keyboard Tray
Pilot Holes
STEP 6 -
Make a Depth Gauge
for Drilling Pilot Holes
STEP 7 - Drilling
Pilot Holes for
Brackets
Use a power drill to make
1/8" holes 3/8" deep using
the masking tape depth
gauge you just made.
Repeat this step for the
remaining Pilot Holes.
8
© 2009 CBT Supply Inc.
Use a glue stick on the back of the template where holes are indicated to be dr illed.
Press the template in place, aligning centerline at front edge of desktop .
Additional guide lines on template are
provided for centered alignment.
NOTE: These illustrations show the
underside of the desktop. If you can
remove the desktop for installation,
this is recommended.
To help prevent the mistake of
drilling though your desktop, use
a depth gauge, or make one
with masking tape. Measure
3/8" from the tip of the 1/8" drill
bit to indicate the dr illing depth
for mounting bracket pilot holes.
Mark the 3/8" depth with a piece
of masking tape wrapped
around the drill bit.
With this completed, the cut-out
and pilot holes should meet
factory specifications. You are
now ready to begin installation
of the flipIT mechanism.