Dux 135ZB4N Benutzerhandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Warmwasserbereiter Dux 135ZB4N herunter. Dux 135ZB4N 20 Seiten. Gas hot water heaters
Auch für Dux 135ZB4N: Benutzerhandbuch (20 seiten)
Owner's Manual – Prodigy 4
Plumbing Connections
Cold Water Connection:
The water heater is intended to be
permanently connected to the water
supply main.
An approved isolating valve, non-
return valve, line strainer (optional but
recommended) and union must be fitted
between the water supply main and the
RP¾"(DN20) socket marked "INLET" at
the bottom of the water heater on the
left hand side.
All fittings must be approved by the
relevant Authority. Plastic pipes or
fittings shall not be used between the
isolating valve and the inlet.
See the diagram below for details.
Cold Water
Inlet
Note: a combined isolating valve/non-return valve/line strainer may be used.
The expansion control valve is only required where local regulations demand,
although it is recommended in areas where the water saturation index is greater
than 0.40.
6
Cold Water Connections
Isolating Valve
(Spindle Vertical)
Line
Strainer
Water Supply Pressure:
This water heater is designed for direct
connection to water supply pressures of
up to 1120 kPa.
Where the mains pressure can exceed
or fluctuate beyond the pressure shown
above, a pressure reducing valve must
be fitted in the cold water inlet supply.
Note for New Zealand, South
Australia and Western Australia:
It is a requirement in these locations that
an expansion control valve be fitted on
the cold water supply line between the
non-return valve and the water heater.
Expansion
Control Valve
Drain
Union
Non-return
Connection
Valve
H3071
3071
Rev. K