AGRI-COVER ACI SRT-2 Installationsanleitung Handbuch - Seite 5

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Traktor-Zubehör AGRI-COVER ACI SRT-2 herunter. AGRI-COVER ACI SRT-2 8 Seiten.
Auch für AGRI-COVER ACI SRT-2: Installationsanleitung Handbuch (8 seiten)

2: ATTACHING MOTOR
Perform one of the following to attach motor:
NOTE: For stainless steel see page 2 for
bolting procedures.
15" CARTRIDGE
A. Remove clevis and cotter pins holding
PVC spacer on end of roll tube. Slide motor
extension into cartridge and PVC spacer.
B. Secure motor to upper pivot arm mount
using (3) 5/16" x 3/4" bolts with lock washers.
C. Slide upper pivot arm with motor over top
of lower pivot arm.
D. Insert drive shaft into motor extension.
Turn roll tube by hand until holes align, then
insert clevis and cotter pin.
E. Square pivot arm with roll tube by
adjusting motor extension forward or
backward as needed.
IMPORTANT: Ensure path of motor arm is
free of obstructions.
NOTE: If not installed square with roll tube
and pivot mount, motor will bind and wobble
during operation.
Cotter pin
Grease
Motor extension
5/16" x 3/4" Bolt
Lock washer
Upper pivot
arm mount
Drive shaft
5
Clevis pin
PVC spacer
Motor
Motor extension on roll tube
90
o
Correctly aligned arm