DV8 OFFROAD SPBR-05 Installationshandbuch - Seite 2
Blättern Sie online oder laden Sie pdf Installationshandbuch für Zubehör für Kraftfahrzeuge DV8 OFFROAD SPBR-05 herunter. DV8 OFFROAD SPBR-05 12 Seiten. Trailing arm skid plate
INSTALLATION
MANUAL
Begin by unpacking all items and inspecting
for missing pieces or damage. If you have any
concerns, please contact the company the
product was purchased from. Extra hardware
may be included with the product.
HARDWARE
INCLUDED
(4) M10x35
(4) M10 Spring Washers
(4) M10 Flat Washers
(4) Aluminum Spacers
(1) T25 "L" Shaped Torx Key
STEP 1 |
Remove the factory plate
gusset located on the inside face of the
frame rails.
On the passenger side it is located
between the frame rail and the gas tank.
To access the bolts, the gas tank will be
lowered down slightly and swung towards
the driverside slightly.
Identify the bolt that will stay in place
to support the gas tank allow it to
swing towards the driverside as it is
lowered down. It is located above the rear
driveshaft.
If the vehicle has gas tank straps instead
of a skid plate, the method for lowering
the gas tank may differ. Be sure the gas
tank is supported with a floorjack.
IT IS POSSIBLE TO INSTALL THIS WITH
A FULL TANK OF GAS, BUT WE HIGHLY
RECOMMEND HAVING TH GAS TANK AS
CLOSE TO EMPY AS POSSIBLE.
855-680-9595
NEED HELP?