4tronix Pi2Go Lite Handbuch - Seite 2
Blättern Sie online oder laden Sie pdf Handbuch für Robotik 4tronix Pi2Go Lite herunter. 4tronix Pi2Go Lite 7 Seiten.
Step 1 - Fit the Front Caster and Line Follower Assembly
You will need the M3 screws, 27mm pillars, ball caster and 9-way extended header and the
line follower PCBA
Fit the 2 pillars to the front of the Pi2Go using 2 of the M3 screws
Carefully push in the 9-way header, then attach the line follower PCBA
<photo missing>
Use the remaining 2 screws to attach the ball caster. If there is a bit of slack in its position,
ensure that it doesn't touch the pins of the connector