Great Lakes GL36SRD Installationsanleitung Handbuch - Seite 7

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Racks & Ständer Great Lakes GL36SRD herunter. Great Lakes GL36SRD 12 Seiten. 19" eia srd swing rack
Auch für Great Lakes GL36SRD: Installationsanleitung Handbuch (8 seiten)

Great Lakes GL36SRD Installationsanleitung Handbuch
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
8
7
both pins (top and bottom) and then open the Swing Frame Rack similar to
that of a door.
LEFT HAND SWING
CAUTION:
LEFT HAND
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
8
7
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
6
6
8
D
C
B
Secure retractable pins into
A
receptacle (2 locations)
8
5
4
OR
RIGHT HAND SWING
5
7
4
7
3
RIGHT HAND
6
3
5
6
5
2
1
2
1
4
7
4
D
C
B
A