Aircraft Espresso AC-755 Schnellstart-Handbuch - Seite 2

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Kaffeemaschine Aircraft Espresso AC-755 herunter. Aircraft Espresso AC-755 9 Seiten. Espresso machine with pid to be used with ground coffee/pods

DESCRIPTION:
1.
Cold water tank
2.
Cup warmer
3.
\
4.
Steam/hot water knob (on the right side)
5.
Filter holder retaining ring
6.
Steam/hot water arm
7.
Removable water drainage tray
8.
Filter holder
9.
Single cup filter
10.
Two cup filter
USER INSTRUCTIONS:
Starting of the machine:
1.
Remove the machine from its packing and make sure all packing parts have been taken off (including the
protection bags).
2.
Lay the machine on a flat and steady surface far away from hot places and from the water taps.
3.
Remove the water tank cover (19) on the top of the machine and take out the water tank (1) paying attention
not to damage the water tubes inside the tank.
4.
Fill the tank (1) with cold water.
5.
Replace the water tank back in the machine and check that the water tubes are not bent and that the filter is
well set on one of them; reposition the tank cover (19).
6.
Plug in the machine in the mains. Make sure that the wall socket has the right voltage.
7.
Place the filter holder (8) under the brewing group (5) and turn it from the left to the right. Leave it there so
that it can get warm and it gets ready for use.
8.
Turn the machine on by pushing the on /off switch (11). The indicator light of the switch (11) comes on to
confirm the power supply.
9.
Open the steam/hot water knob (4).
10.
Position the lever switch (13) on coffee mode and press the pump switch (22).
11.
When water comes out of the steam nozzle (6), let down the pump switch (22) and close the steam/hot water
knob (4).
12.
After completing all these operations, leave the machine on.
13.
The PID (21) will visualize the degrees inside the boiler and will control the boiler's heating.
14.
The PID is already set from the producer on 95°C, i.e. the ideal temperature for a good cup of coffee. (If you
want to change the PID's temperature, please follow the instructions written under How to set the
temperature inside the boiler by means of the PID).
Preparing an espresso:
15.
Check that the water tank (1) has been filled in with water by looking at the water level indicator (20).
16.
Press the on/off switch (11): the indicator light of the switch (11) will come on. Do this operation only if the
machine is off. If it's on pass to the following point.
17.
As soon as the PID's display shows the set temperature and the indicator light (14) remains on, the machine is
ready for use.
18.
Fit the single cup filter (9) or the two cup filter (10) into the filter holder (8) that has been warmed up by
leaving it attached to the brewing group as described in point 7.
19.
Fill the filter with ground coffee by means of the supplied measure spoon (16): 1+ ½ measuring spoonful (16)
= 1 coffee cup - 3 measuring spoonful (16) = 2 coffee cups. Every time you fill the filter with a spoonful of
coffee, press the coffee with the coffee press/tamper (15) before proceeding to fill it with the next spoonful
and make sure that there are no coffee rests on the filter border.
20.
Insert the filter holder (8) in the brewing group ring (5), turn it from left to right with force, then put the cup
on the removable water drainage tray (7).
21.
Position the lever switch (13) on coffee mode and lift up the pump switch (22). The manometer (17) will show
the reached pressure, between 8 and 14 bar.
22.
Once you get the desired quantity of coffee, push down the switch (22) again.
23.
Remove the filter holder (8) and throw away the coffee grounds. Make sure that the filter holder is clean and
reposition it in the brewing group to warm up again.
Preparing an espresso with the use of coffee pods:
24.
Check that the water tank (1) has been filled in with water by looking at the water level indicator (20).
25.
Press the on/off switch (11): the indicator light of the switch (11) will come on. Do this operation only if the
machine is off. If it's on pass to the following point.
26.
As soon as the PID's display shows the set temperature and the indicator light (14)remains on, the machine is
ready for use.
Page 2
11.
On/off switch (on the right side)
12.
\
13.
Coffee/hot water/steam lever switch
14.
Indicator light: machine ready
15.
Coffee press/tamper
16.
Measuring spoon
17.
Manometer
18.
Filter for pods
19.
Removable water tank cover
20.
Water level indicator
21.
PID temperature control
22.
Pump lever switch
English