Dynabrade 64100 Betriebshandbuch - Seite 3

Blättern Sie online oder laden Sie pdf Betriebshandbuch für Industrielle Ausrüstung Dynabrade 64100 herunter. Dynabrade 64100 8 Seiten. 21" metalworking station

Buy parts on line at https://Dynashop.co.uk/ for all things Dynabrade
SET-UP INSTRUCTIONS
1. Before operating your 21" Metalworking Station, you must first make
sure your tool is plumb and level. Failure to do so may impede proper
function of the tool.
2. Be sure that both your reservoir valve and your main tank valve are
in the "OFF" position.
3. The next step is to add water to your station. Fill the main acrylic tank
(A) with water until you reach the line that indicates the proper level in
the "Power off" position. Continue by adding water to the reservoir (B),
approximately 3/4" to the top.
(1) IMPORTANT: TOOL MUST
BE PLUMB & LEVEL
(B)
(6) VISUALLY INSPECT
WASHING ACTION
(2) RESERVOIR LABEL
INDICATES CORRECT
POSITION PER
REQUIRED FUNCTION
(4)
Buy parts on line at https://Dynashop.co.uk/ for all things Dynabrade
W E T D E B U R R I N G S TAT I O N : S E T- U P
(2) VALVE ARM
PERPENDICULAR
TO VALVE BODY
IS CORRECT FOR
"OFF" POSITION
(Shown in "OFF" Position)
4. Switch reservoir valve to "Float" position.
5. Plug in the 21" Metalworking Station. Be sure to push the reset button
on the GFI plug before turning system on. Turn power switch on.
Note: Auxiliary outlet power is controlled by the main
power switch.
6. Continue by checking for vigorous washing action which is visible just
below filter access panel as noted.
7. Install work surface.
(A)
3
(5) POWER SWITCH
(5)
(7)
(3)