Agrilight AGRIBOX pro Schnelleinführung Handbuch - Seite 9
Blättern Sie online oder laden Sie pdf Schnelleinführung Handbuch für Schalter Agrilight AGRIBOX pro herunter. Agrilight AGRIBOX pro 20 Seiten.
Step 1
Draw up a lighting plan
Before you start to install the AGRIBOX pro, you should first consider carefully how you want
to work in the building. Questions that you should ask yourself:
• Into how many groups do I want to divide the building?
• For how many hours are the fixtures to be switched on per group?
• For which groups do I want the light power to be adapted to the daylight?
Lay down your wishes in a lighting plan. Has the lighting plan been finalised and adopted?
Then you are ready to install AGRIBOX pro.
Step 2
Preparation for use: Installation and electrical connection
In order to prepare AGRIBOX pro for use, it must first be installed and the electrical
connections made.
We recommend that the fixtures are connected via the AGRIBOX pro Switch. The AGRIBOX
pro Switch can disconnect the installation from the mains power supply, e.g. for maintenance
work.
Do you want to control more fixtures than the maximum number indicated in the specifications?
Every time you exceed the maximum number, add an AGRIBOX pro slave to an AGRIBOX pro
Switch. If these products did not form part of your delivery, you can order them separately.
If you use a light sensor, this should preferably be installed on the north side of the
building. Set the light sensor dip switches in the 20 kLux position before calibration:
Dipswitch 3 ON, Dipswitches 1,2 and 4 OFF. Set the light sensor dip switches in the 2 kLux
position after calibration: Dipswitch 2 ON, Dipswitches 1,3 and 4 OFF.
Step 3
Setting the AGRIBOX pro (basic settings)
When you have prepared the AGRIBOX pro for use and drawn up a lighting plan, you now
have to set the AGRIBOX pro. Keep your lighting plan available for this.
Set language
and go to Settings > Language. Choose the preferred language.
Press
Set date and time
In order to ensure that programs that you will create later are executed at the right time, you
first have to set the date and time.
Press
and go to Settings > Date & Time.
Set number of groups
The AGRIBOX pro controls groups of light fixtures. For example, you can switch whole group
of fixtures on or off with one press of a button. You can set the number of groups yourself. The
maximum number of groups that you can set is 5.
Press
and go to Settings > Settings > Number of groups.
Tip: Note in your lighting plan which group numbers correspond to the groups in your plan.
Add fixtures
Now the fixtures are connected, you can not control them with the AGRIBOX pro yet. Next step
is to search for the drivers in the controlbox. This requires just a few simple actions in the
Settings menu. Once the fixtures have been found, you are ready to divide the fixtures into
groups.
and go to Settings > Search (Search mode = all, Search drivers = yes).
Press
9