GREAT PLAINS BD7600 Schnellstart-Handbuch - Seite 5
Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Bohrer GREAT PLAINS BD7600 herunter. GREAT PLAINS BD7600 20 Seiten. Box drill
Auch für GREAT PLAINS BD7600: Handbuch für die Feldanpassung (12 seiten)
4. On the Speed Settings menu, tap
5. On the ground, mark a start point and end point
with a distance of 300 ft. (91.5 m) apart.
Please Note: Ground conditions should be
i
representative of field conditions. Great
Plains
recommends
calibration in the field for best results.
6. Once the start-and-end markers have been
placed in field conditions 300 ft. (91.5 m) apart,
drive the tractor near the start point marker.
Continue to drive the tractor approaching the
start point marker.
Please Note: Intended field speed should
i
be maintained while traveling the 300 ft.
(91.5 m) distance between the start-and-end
points for an accurate speed calibration.
7 . As you drive the tractor pass the start point
marker, on the Implement Speed Calibration
menu, tap
soft key. This begins the calibration
operation.
8. Continue to drive the tractor towards the end
point marker.
Great Plains | 195-835QS | 03/25/2022
soft key.
completing
speed
BD7600 Quick Start Guide
9. As you drive past the end point marker, on the
Implement Speed Calibration menu, tap
key. This will end the calibration operation.
Please Note: It will cancel the speed
i
calibration operation if you tap
No results will be saved.
Please Note: The number of impulses will
i
continuously update in the Speed Input field
as you travel the 300 ft. (91.5 m) distance
between the start-and-end point markers.
Shown below.
10. To accept the displayed calibration results, tap
soft key.
soft
soft key.
4