GReddy Turbo Kit Installationshandbuch - Seite 8

Blättern Sie online oder laden Sie pdf Installationshandbuch für Zubehör für Kraftfahrzeuge GReddy Turbo Kit herunter. GReddy Turbo Kit 18 Seiten. 96-98 nissan 240sx s14 (ka24de) td06-20g 8cm2
Auch für GReddy Turbo Kit: Installationshandbuch (18 seiten), Installationshandbuch (13 seiten)

GReddy Turbo Kit Installationshandbuch
2. Removal of Stock Parts
When removing the stock parts, make sure you read over the
factory repair manual for proper procedures.
2-1 Disconnect the negative terminal of the battery.
2-2 Drain the engine oil and power steering fluid.
2-2 Disconnect the air flow meter.
2-4 Remove the Air cleaner assembly with airflow meter, intake tube, breather hose
and Intake temperature sensor.
2-5 Disconnect the primary and secondary O2 sensor and remover the catalytic
converter.
2-6 Remove the exhaust manifold.
2-7 Remove oil pan (Please refer to the factory service manual for detail instructions
for removing the oil pan.)
2-8 Remove the fuel rail assembly with injectors and regulator.