Celexon battery screen V2.0 Professional Plus Betriebsanleitung - Seite 8
Blättern Sie online oder laden Sie pdf Betriebsanleitung für Projektor-Zubehör Celexon battery screen V2.0 Professional Plus herunter. Celexon battery screen V2.0 Professional Plus 12 Seiten.
Make sure that the screen is installed
straight and level. Tighten the screws
and install the bottom screws in the
side cap on both sides.
Caution:
Do
not
overtighten
the
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal plates are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
OPERATION
CONTROL VIA THE HOUSING BUTTONS
Side cap left
(viewed from the front)
Charging socket
ON / OFF
7