Celexon Electric Professional Betriebsanleitung - Seite 6
Blättern Sie online oder laden Sie pdf Betriebsanleitung für Projektor-Zubehör Celexon Electric Professional herunter. Celexon Electric Professional 8 Seiten.
Auch für Celexon Electric Professional: Betriebsanleitung (11 seiten)
Drill the holes at the markings in the
diameter to match the ring eyelets
used, screw them fi rmly into the ceiling
(using plugs where appropriate and in
accordance to the manufacturer and
the load of the of the screen) and hang
the screen from them.
MOUNTING ON THE CEILING (SCREWED)
Measure the distance between the
holes in the side caps (two per cap)
and transfer them to the ceiling. Drill
the holes at the markings to the right
diameter for the mounting material,
insert and screw the screen in place
tightly. Make sure that the holes are
parallel to the wall! Use dowels and
screws suitable for your base.
Caution:
Do
not
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal plates are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
overtighten
the
5