Celexon Electric Professional Betriebsanleitung - Seite 7

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Whiteboard Celexon Electric Professional herunter. Celexon Electric Professional 8 Seiten.
Auch für Celexon Electric Professional: Betriebsanleitung (11 seiten)

MOUNTING ON THE WALL

Measure the distance between the
holes in the side caps (two per cap)
and transfer them to the wall.
Drill the holes at the markings with the
holes with the right diameter for the
mounting material and make sure that
the drill holes are absolutely level (Use
a spirit level!).
Use dowels and screws that are
suitable
for
your
mounting
surface. Screw the two upper screws
into the wall most of the way and hang
the screen from both sides into the
upper hole. Make sure that the screen is
installed straight and level. Tighten
the screws and then tighten the lower
screws on both sides of the screen.
Caution:
Do
not
overtighten
the
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal shims are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
6