Celexon Professional Plus Betriebsanleitung - Seite 6

Blättern Sie online oder laden Sie pdf Betriebsanleitung für Whiteboard Celexon Professional Plus herunter. Celexon Professional Plus 11 Seiten. Screen
Auch für Celexon Professional Plus: Installationshandbuch (13 seiten), Benutzerhandbuch (8 seiten), Betriebsanleitung (6 seiten), Betriebsanleitung (8 seiten)

Celexon Professional Plus Betriebsanleitung
Drill the holes at the markings at a
diameter to match the diameter of
the ring eyelet used, screw them
fi rmly into the ceiling (according to the
manufacturer's instructions and the
load capacity of the screen) and hang
the screen.
MOUNTING ON THE CEILING (SCREWED)
Measure the distance between the
holes in the side caps (two per cap)
and transfer them to the ceiling. Drill
the holes at the markings to the right
diameter for the mounting material,
insert and screw the screen in place
tightly. Make sure that the holes are
parallel to the wall.
Use dowels and screws suitable for
your surface.
Caution:
Do
not
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal plates are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
overtighten
the
5