DynaQuip WaterCop ACA100 Benutzerhandbuch und Installationshandbuch - Seite 14

Blättern Sie online oder laden Sie pdf Benutzerhandbuch und Installationshandbuch für Kontrollsysteme DynaQuip WaterCop ACA100 herunter. DynaQuip WaterCop ACA100 16 Seiten.

DynaQuip WaterCop ACA100 Benutzerhandbuch und Installationshandbuch

Compression Fittings

The unit can be installed with compression fittings using common household tools and basic
mechanical ability . You will need:
two fittings (male pipe thread x compression)
available at most local hardware or plumbing
supply stores;
Teflon® tape or thread sealant;
Measure the outside diameter of the copper tube and note the valve size to be sure the proper
size fittings are purchased .
Steps of Installation using Compression Fittings
1 . Remove nuts and sleeves from compression fittings and install fittings into each end of the
valve using Teflon® tape or thread sealant to ensure a watertight seal . Hold one wrench on
flats of valve body and use the other to tighten fittings .
2 . Measure the distance from end to end of valve assembly once fittings are secure . For ½" tube
( ⁵ / ₈ " outside diameter) subtract ½", for ¾" tube ( ⁷ / ₈ " outside diameter) subtract ¾" from your
valve assembly measurement . This is the length of the section of tubing to be cut out of the
existing line . The piece of existing tubing is shorter than the measured length so that the tube
ends extend into the compression fittings .
3 . Select the location for the WaterCop® Valve and Actuator . After cutting the section of tube out
of the line, you will need to shift the tube ends to be able to fit the unit in place . Make sure
you will have access and room to adjust before cutting the tube .
4 . Mark the tube in the location you have selected . Double check the length and location marked .
5 . Turn water off and drain the system .
6 . Use tube cutter to cut copper tube at the locations you have marked . Careful, there will
probably still be some water in the line .
7 . Remove any burrs from tube ends and clean ends .
8 . Install compression nuts and sleeves to each tube end .
9 . Shift tube ends to install WaterCop® Pro Valve in line .
10 . Position the unit and tighten compression nuts . Hold the fitting with one wrench while
tightening the nut with the other . Tighten both nuts .
11 . Plug Water Control Panel into a proper power source and turn valve to OPEN position
(open button/green light) .
12 . Unplug unit, turn water back on and carefully check for leaks .
13 . Plug unit back into power source . Installation is complete .

Solder Fittings

An alternative method is to solder the unit into the water line . This method requires a
considerably higher skill level to accomplish the installation properly and safely . If you are not
skilled in this area, it is strongly recommended that you contact a professional plumber to do this
type of installation .

Electrical Connection

The Water Control Panel is supplied with a power adapter . Consult local electrical codes as to
the necessity of ground fault protection . It is recommended that the Water Control Panel not be
plugged into an extension cord . Review "Specification" current and power requirements so as
not to overload the circuit supplying power .
14
tubing cutter;
ruler;
pencil or marker;
two large adjustable wrenches .