activTek INDUCT 750 Benutzerhandbuch - Seite 6

Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Luftreiniger activTek INDUCT 750 herunter. activTek INDUCT 750 9 Seiten. Electronic air purification system

activTek INDUCT 750 Benutzerhandbuch
10
FIBERGLASS DUCTWORK INSTALLATION
5
Stud
5. Insert (4) 2" Threaded bolts into screw holes at
corners of mounting plate. Attach (4) toggle bolt
anchors to ends of threaded bolts.
7
7. Insert (4) toggle bolts into 3/8" holes in duct. Be
sure toggle anchors open after inserting.
9
9. Insert unit into opening. Be sure the air will pass
though the ActivePure® cell honeycomb matrix.
11
11. Plug unit into working power receptacle. Hard wiring unit into
HVAC system should be done by a licensed HVAC installer or
electrical contractor only.
(CONTINUED)
6
6. Remove backing from mounting plate
adhesive gasket.
8
8. Center large opening in mounting plate over
3.5" opening in duct and press plate to duct.
The adhesive gasket will hold the mounting
plate into place.
Tighten toggle bolts - DO NOT OVERTIGHTEN.
10
10. Secure the unit to the mounting plate with (4)
#8-32 nuts.
11