HIGH VOLUME O2 HVO GO+GO NAKED Setup-Handbuch - Seite 10
Blättern Sie online oder laden Sie pdf Setup-Handbuch für Drohnen HIGH VOLUME O2 HVO GO+GO NAKED herunter. HIGH VOLUME O2 HVO GO+GO NAKED 16 Seiten.
Step 7: Prepare the Drone
● The naked drone is the tank with the exposed compressor on top.
● Position the drone so that the braided steel line can reach between
the two tanks, leaving at least 2-3 inches of slack.
● connect the braided steel line to the two tanks:
○
The steel line is shipped with teflon tape on both ends.
teflon tape or the fitting will leak oxygen.
○
Ensure that the opening in each tank has a bushing into which you can thread the
ends of the steel line.
○
Use two adjustable wrenches to tighten each
End of the steel line -- One to stabilize the
bushing and the other to tighten the fitting..
Do not install without
master
drone
10