Gallagher C500615 Hinweise zur Installation - Seite 3

Blättern Sie online oder laden Sie pdf Hinweise zur Installation für Messgeräte Gallagher C500615 herunter. Gallagher C500615 8 Seiten. Smb monitoring kit

Gallagher C500615 Hinweise zur Installation

Wiring connections

Connect the Alula BAT-Connect as shown. Set jumper JP7 on the D8 Board to position 2.
Alula
BAT-Connect
Connect
supplied
cable tie
for strain
relief
Earth connected
to cabinet door
Install the antenna
outside the cabinet
Alula Antenna
OUT 5
OUT 6
IN 16
IN 15
IN 14
IN 13
VIN
GND
Secondary
8In 4Out
Board
A
B
IN 12
IN 11
IN 10
IN 9
OUT 7
OUT 8
Earth connected
to cabinet wall
JP2
JP1
12V 4A B100
Power Supply
Blk:BR J6
Org:DC out J5
Reader
Blu: DC in J4
Blk:BR J2
D1
D2
D3
D4
D5
D6
D7
D8
Battery
(not supplied)
PSTN Dialer
mounted vertically
-
+
A
B
-
+
A
B
Controller
-
+
Primary
8In 4Out
Board
Blk:BR J3
Blu:DC in J1
Converter
Safety Power
JP9
Org:B2 J3
Blu: B1 J1
D8 Fused
Power
Distribution
Board
Alula D7 connection
Set JP7 to position 2
RS232
PSTN Dialer
LAN
Mains coming into
Main Earth Connection
Blk:BAT-
Red:BAT+
Blk:BR
Blu:DC1+
24V 6A Life
Supply Unit
N EG L
Battery
(not supplied)
the cabinet