Dyness Deye SUN-5K-SG01LP1-US Setup-Handbuch - Seite 7

Blättern Sie online oder laden Sie pdf Setup-Handbuch für Inverter Dyness Deye SUN-5K-SG01LP1-US herunter. Dyness Deye SUN-5K-SG01LP1-US 7 Seiten.

Example: set like this picture means 06:00~12:55, battery
discharge to Grid until SOC is 20%; 12:55~06:00(tomorrow),
Battery charge through Grid until SOC is 100%.
Step 11: You are ready to go
Step 12: Shut Down
POWEBOX
1 Remove all the load
2 Turn off DC breaker of Powerbox.
3 Long press 3s Reset button of the Powerbox to power off battery
4 Disconnect PV/Grid
5 Turn off the inverter power switch,shut down the inverter
B4850/B3 Parallel
1 Remove all the load
2 Turn off DC breaker between the battery and inverter.
3 Disconnect PV/Grid
4 Turn off the inverter power switch,shut down the inverter
5 Long press SW button to power off the battery,from the master to
the slaves one by one.Then switch off all the batteries' Power switch