Highway Equipment Company NEW LEADER G4 Wie prüfen - Seite 4
Blättern Sie online oder laden Sie pdf Wie prüfen für Streuwagen Highway Equipment Company NEW LEADER G4 herunter. Highway Equipment Company NEW LEADER G4 13 Seiten. Spread pattern
SPINNER ASSEMBLY INSTALLATION CONTINUED
LH
Figure C – Fin Location for 34" Conveyors
Figure D – Material Divider Installation
G
4
HIGHWAY EQUIPMENT COMPANY
RH 5. Make sure the fins are installed on the
spinner discs correctly. Position all fins in
the position 2 as shown in Figure C.
6. Set spinner RPM at 550-575 for compost
initially. These settings can be found using
the controller in the cab.
sensor will measure the spinner's speed.
7. Slide the slots of the material divider (Item
8) onto both sills so material divider's
mounting tab rests on sills' flanges. Align
two holes on outside of each sill with
material divider holes, insert capscrews
and loosely attach washers, lock washers
and nuts.
flanges with capscrews, lock washers and
nuts. Tighten all hardare.
4
The spinner
Secure mounting tab to sill'
305438-SP-A
Page Rev. A