Galvin Engineering CliniLever TCBTJ150HC Produkt-Installation - Seite 3

Blättern Sie online oder laden Sie pdf Produkt-Installation für Sanitärprodukt Galvin Engineering CliniLever TCBTJ150HC herunter. Galvin Engineering CliniLever TCBTJ150HC 5 Seiten. Basin/sink top assembly

Galvin Engineering CliniLever TCBTJ150HC Produkt-Installation
Product Installation Guidelines
Lever handle
Adaptor bush
Spindle
3. Locate handle
Insert the adaptor bush onto the spindle
When the spindle is in the closed
position, firmly press the lever handle
onto the spindle with levers facing
forward.
Check the handle operation. It should
turn freely for a ¼ turn.
5. Fit water temprature indicator & testing
Once the lever handles are secure, fit the
appropriate water temperature indicators.
Hot/warm on the left handle, cold on the
right.
Once secured, connect the hot and cold
water.
Open the lever handles and ensure that
there is flow from both hot and cold
inlets.
Inspect the tap and check for any leaks.
© Galvin Engineering Pty Ltd
4. Fit handle
-
Secure the handles in position using the supplied
screws and washers.
Document No.: 001.00.10.00
Version 1, 23 November 2021, Page 3 of 5