Galvin Engineering CliniLever TCBTJ80HC Produkt-Installation - Seite 2
Blättern Sie online oder laden Sie pdf Produkt-Installation für Sanitärprodukt Galvin Engineering CliniLever TCBTJ80HC herunter. Galvin Engineering CliniLever TCBTJ80HC 5 Seiten. Basin/sink top assembly
Product Installation Guidelines
PRE-INSTALLATION -
Note: Before installation, all lines must be flushed. We recommend that a line strainer be installed prior to top
assembly to eliminate any foreign material.
TCBTC80CC/TCBTC80HC/TCBTJ80CC/TCBTJ80HC
INSTALLATION
IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions and
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply
conditions must also comply to the applicable National and/or State standards. Failing to comply with these provisions
shall void the product warranty and may affect the performance of the product.
Basin body
(Not Supplied)
1. Disassemble & Fit
-
Disassembly the top assembly per part
and fit the spindle to the basin body
-
The top assembly is designed to screw
directly into any 15mm body that
complies with Australian Standard
AS/NZS 3718. Check that the existing
valve body complies to AS/NZS 3718.
© Galvin Engineering Pty Ltd
MOUNTING DETAILS
Spindle
TCBTC150CC/TCBTC150HC/TCBTJ150CC/TCBTJ150HC
2. Fit basin/sink flange
−
Tighten the vanity flange onto the threaded basin
body.
−
Take care not to overtighten
Document No.: 001.00.10.00
Version 1, 23 November 2021, Page 2 of 5