Galvin Engineering Ezy-Push CP-BS Lead Safe Produkt-Installation - Seite 3

Blättern Sie online oder laden Sie pdf Produkt-Installation für Sanitärprodukt Galvin Engineering Ezy-Push CP-BS Lead Safe herunter. Galvin Engineering Ezy-Push CP-BS Lead Safe 4 Seiten. Timeflow push button replacement cartridge – adjustable

Galvin Engineering Ezy-Push CP-BS Lead Safe Produkt-Installation
Product Installation Guidelines
ADJUSTING TIME FLOW
1. Disassemble
− Dismount the button head
− Remove the grub screw with a 1.5 mm
allen-key (not supplied)
3. Fix position
− Orientate the stop ring to allow the refitting
of the grub screw
© Galvin Engineering Pty Ltd
2. Adjust stop-ring
− Turn the stop-ring clockwise to increase flow
time or anti-clockwise to reduce it.
4. Reassemble
− Reassemble completely paying attention to
align the hole in the spindle with the grub screw
Version 1.1, 13 May 2021, Page 3 of 4