Galvin Engineering GalvinSafe 190.80.10.12 Produkt-Installations-Manualline - Seite 3

Blättern Sie online oder laden Sie pdf Produkt-Installations-Manualline für Sanitärprodukt Galvin Engineering GalvinSafe 190.80.10.12 herunter. Galvin Engineering GalvinSafe 190.80.10.12 7 Seiten. Free standing combi shower, axion msr eye/face wash, hand activated

INSTALLATION PROCEDURE

Refer to Installation Drawing for clarification. Check parts list to ensure all required
parts are included. Use AS 4020 approved pipe joint sealant on all connections.
STEP 1: Prepare the emergency shower foundation by using the floor flange as a
template. Locate the three holes for the 3/8-16 UNC x 6" anchor bolts. (Not
supplied). They should extend 1" above the floor level.
STEP 2: Once the concrete foundation is ready (dry), assemble the floor flange to the
anchor bolts; then securely fasten with 3/8-16 UNC Hex nuts and 3/8"
washers (Not supplied). Seal and tighten floor flange and (1-1/4") tee making
certain the waste tee is facing the proper location and the foot control holes
are facing side to side.
STEP 3: Assemble nipple (1-1/4" x 24") to the tee and tighten with a pipe wrench.
STEP 4: Assemble the eye/face wash loop assembly to the (24") nipple from Step
three. Connect the pipe wrench to the nipple between the two tees to avoid
damage.
STEP 5: Assemble in the following order:
Attach nipple (1-1/4" x 24") onto the loop assembly.
Attach nipple (1-1/4" x 24") onto the tee.
Attach tee (1-1/4" x 1-1/4" x 1") onto nipple.
Attach nipple (1" x 8") and valve assembly onto tee.
Attach street elbow (1") and nipple (1" x 12-1/2") onto valve.
STEP 6: Assemble showerhead onto street elbow (1").
STEP 7: Assemble the sign onto the unit. Use the strap, screws, washers and nuts
provided to mount the sign onto the upright. The sign should be
positioned for maximum visibility.
STEP 8: Insert the plug into the optional supply line tee that is not used. Before
connecting the supply water line to the emergency shower; CHECK IF THE
ASSEMBLY IS RIGIDLY TIGHTENED AND FLUSH THE LINE
THOROUGHLY.
tth
Version 3.1, 13
Aug. 2021, Page 3 of 7