AGS Merlin GDP2X Handbuch für Installation und Betrieb - Seite 5

Blättern Sie online oder laden Sie pdf Handbuch für Installation und Betrieb für Gas-Detektoren AGS Merlin GDP2X herunter. AGS Merlin GDP2X 16 Seiten. Gas detection panel

Installation & Operation Manual
Merlin GDP2X

Wiring the GDP2X

Mains supply must be connected by a
Always power down the panel when
competent person and according to
wiring external circuits to prevent
any regulations.
damage to electronics.
MAINS POWER CONNECTION
100-120V AC mains power should be supplied to the [POWER/LINE IN] connector using a 3 core
cable and fused at 3A.
On connecting the mains supply to the panel the power LED indicator will light up – this is
located on the front cover (red dot on the AGS Logo).
VALVE OUTPUT
100-120V AC electrical power supplied from the [VALVE OUT] connector
using a 3 core cable can be connected to a gas solenoid valve which can
shut the gas supply on alarm status.
Refer to your valve manual for more information and wiring!
GAS DETECTORS
A 12-24V power and data supply to gas detectors are wired to [DETECTOR CHAIN] connectors.
AGSGDP2X - IOM Iss: 3 03-20
5