AgSense CROP-LINK Verdrahtungshinweise - Seite 6
Blättern Sie online oder laden Sie pdf Verdrahtungshinweise für Messgeräte AgSense CROP-LINK herunter. AgSense CROP-LINK 8 Seiten. 2012 - 14 soil moisture monitoring
Auch für AgSense CROP-LINK: Verdrahtungshinweise (10 seiten)
Power and Relay Wiring Instructions:
Choose one of these two ways to connect power to the cable that is
1.
attached to our box :
Make sure power switch in the upper left portion of our circuit
2.
board is turned on.
Once you have power applied to our unit, Call AgSense at
3.
605-352-8350 to have the configuration sent to the unit so it will
start to read the flow meter.
Also, once power is applied to our unit, the configuration has been
4.
sent to the unit, and water is flowing through the pipe, the GPS
light in the upper right corner of our circuit board will be blinking.
Optional: This unit has 2 relays that can be used to via the website to
remotely control other equipment.
- Relay/Wire Connections -
Relay 1 Common = Blue
Relay 1 Normally Open = Orange
Relay 1 Normally Closed = Yellow
Relay 2 Common = Blue/Black stripe
Relay 2 Normally Open = Orange/Black stripe
Relay 2 Normally Closed = Yellow/Black stripe
- AC powered units -
Black = 120v Power Input
Brown/Black stripe = Neutral
- DC powered units -
Red = 7-40v DC + Power Input
Red/black stripe = DC GND
Page 4