AFL Hyperscale 6RU Installationshandbuch - Seite 7
Blättern Sie online oder laden Sie pdf Installationshandbuch für Computer Hardware AFL Hyperscale 6RU herunter. AFL Hyperscale 6RU 20 Seiten. Front-access v-panel
Auch für AFL Hyperscale 6RU: Installationshandbuch (12 seiten), Installationshandbuch (16 seiten)

Panel Mounting
Remove the shipping bracket fixing
3
bolts (QTY x 4) using socket wrench and
screwdriver.
Using socket wrench or spanner, remove
5
shipping bracket bolts (QTY X 6 per side).
Series
U-Series 6RU Front-Access V-Panel (FVP)
Using handles, lift panel out of shipping crate.
4
Weight: approx. 25kg - TAKE CARE WHEN
LIFTING.
Activate black lever to detach slide rail
Starting from top to bottom, slide out and de-
6
latch rail, and set aside to splice one at a time.
© AFL Hyperscale. All rights reserved
7