MAINLINE Duo Handbuch - Seite 12
Blättern Sie online oder laden Sie pdf Handbuch für Water Filtration Systems MAINLINE Duo herunter. MAINLINE Duo 19 Seiten.
Clean up the central chamber framework and lay the new bag, seam
down on a flat surface.
Holding the chamber lengthways down and slide the bottom of the
chamber into the new bag.
Put the top of the central chamber onto a flat surface and pull the bag
down the length of the chamber.
Lift the chamber up and pull the rest of the bag onto the chamber as far
as it will go
.
Page | 12