AFL Hyperscale 2RU Installationshandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Installationshandbuch für Drahtloser Zugangspunkt AFL Hyperscale 2RU herunter. AFL Hyperscale 2RU 16 Seiten. Front-access v-panel (fvp)
Auch für AFL Hyperscale 2RU: Installationshandbuch (17 seiten), Installationshandbuch (20 seiten)
Cable Installation
Remove tape from the tube, feed nylon
10
braid onto fiber towards cable, and remove
tube from fiber.
Hose
Clamps
Attach cable to clamp with hose clips and
12
place braid tails into slots.
8
© AFL Hyperscale. All rights reserved
25mm/1"
approx.
Repeat steps 6-10, ensuring all fiber has braided
11
sleeve and tape braid sleeve at cable jacket end.
Cable
Braids
Position and screw cable breakout unit onto
13
side of panel.
Tape
Series