Closed heating system
Installation of boiler BioSolid to closed heating system
Scheme 1a. An example of building in of accumulation tank into the central heating
system required under EN 303-5
bar
1
2
10
9
Shema 1b. An example of building in of
accumulation tank into the central
heating system not required under
EN 303-5
1
T
bar
2
9
10
10
7
3
8
5
-Obligatory installation of air self-
1
venting group (safety valve 2,5 bar)
2
-Thermal protection of boiler
-Manual 3-ways mixing valve
3
-Manual 4-ways mixing valve
4
-Thermostat valve-Temperature of
5
return line min. 60°C
6
6
-Thermometer
-Room thermostat
7
-Accumulation tank (CAS)
8
4
-Closed-type expansion vessel
9
-P1 - Pump of the heating system
10
Technical instructions BioSolid
Figure 6. Fuel supply method
DR
DV
Note: For opening the boiler doors see point 8.0. and Figure 5.
LEGEND:
-
VL
Boiler door of the combustion chamber
-
SV
Microswitch
DV
-
Lower boiler door
-
PZ
Lever for opening / closing the boiler door of the combustion chamber
-
DR
Wood log
Figure 7. Protective gloves
Protective gloves are obligatory!

10.0. BOILER USE

Boiler must not be used in flammable and explosive environment.
It must not be used by children or disabled persons (either physically or mentally),
as well as by person without knowledge or experience, unless they are under
control or trained by s person responsible for their safety. Children must be
supervised in the vicinity of the product. If the supply cord is damaged, it must be
replaced by the manufacturer, its service agent or similarly qualified persons in
order to avoid a hazard. Protective gloves are obligatory (Figure 7.).
Check whether boiler and equipment are installed and connected in accordance
with these Technical instructions including all points from 1.0 to this 9.0. Check
whether chimney meets requirements of point 4.0 therein. Check whether boiler
room meets all requirements therein. Check if fuel fulfils all requirements therein.
Check whether the boiler and the entire heating system are filled with water and
vented. Check whether safety elements have been correctly installed and in proper
working order (see previous points of instructions). Check whether uptake duct is
sealed and thermally insulated.
Technical instructions BioSolid
Fuel supply method, boiler use
VL
PZ
SV
23