Centurion R3 Handbuch zur Schnelleinrichtung - Seite 2

Blättern Sie online oder laden Sie pdf Handbuch zur Schnelleinrichtung für Toröffner Centurion R3 herunter. Centurion R3 17 Seiten. Rotary swing gate operator
Auch für Centurion R3: Handbuch zur Schnelleinrichtung (19 seiten), Handbuch zur Schnelleinrichtung (2 seiten)

Centurion R3 Handbuch zur Schnelleinrichtung
1
R
EQUIRED
Check that you have all the tools required. (IM page 12)
2
S
C
ITE
Check for the safety and suitability of the site by looking at: (IM page
13)
All safety and local authority requirements.
That the gate is within the operator specifications.
Check that there is enough ground clearance to enable assembly
of the drivearm clamps. (See Figure 4)
3
C
ABLING
Consider all cabling requirements and routing as in Figure 9. (IM page
14)
4
O
PERATOR
Estimate the gate swing angle with figure 1.
Then mark the operator's position according to figure 2 or 3.
(IM page 15)
o
120
110
Figure 1 Gate Opening Angle Diagram
All manuals and user guides at all-guides.com
T
& E
OOLS
ONSIDERATIONS
R
EQUIREMENTS
I
NSTALLATION
o
o
o
100
80
90
QUIPMENT
(Gate opening angle)
o
60
o
70
o
o
0