Major tech MT575 Gebrauchsanweisung - Seite 13
Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Prüfgeräte Major tech MT575 herunter. Major tech MT575 16 Seiten. 10kv high voltage insulation tester
7. Press the ESC/backlight button again to return back to the
main page
7.1.4.3.Function 3 – Display the data stored
(Log Display)
1. Turn on the insulation tester by rotating the function rotary
switch to any position(except OFF).
2. Press the SEL function to enter the minor function selection
3. Press the ▲ "up button" or the ▼ "down button to find the
measurement time setting; LCD displays the following
picture respectively;
4. Press the ENTER/SAVE button, LCD displays the picture
shown in below:
5. Press the ENTER/SAVE button to query the subpage of data
(include Resistance value, testing voltage, PI, DAR, Saving
Date & Time).
6. Press the ▲ "up button" or the ▼ "down button to select
the required data value. If no data available, LCD displays
the picture shown in below
7. After the query is over, press the ESC/ button to return
back the minor function selection.
8. Press the ESC/ button again to return back to the main
page.
7.1.4.4. Function 4 – Clear/Erase the data stored
(LOG Clear)
1. Turn on the insulation tester by rotating the function rotary
switch to any position(except OFF).
2. Press the SEL function to enter the minor function selection.
13