Jalousie-Welt Pergola PRO Betrieb und Wartung, Versand-, Auspack- und Installationsanweisungen - Seite 8
Blättern Sie online oder laden Sie pdf Betrieb und Wartung, Versand-, Auspack- und Installationsanweisungen für Zubehör Jalousie-Welt Pergola PRO herunter. Jalousie-Welt Pergola PRO 20 Seiten.
3.3.
Service, shipment, unpacking and storage
The awning is so packed that it can be delivered without damage. During loading and unloading of the
awning be sure it was not placed on an uneven surface. Upon unpacking the product you keep a special
care not to damage the fabric.
If the awning will be stored for a long time, before installing we recommend:
Store the awning in the shade.
Protect the awning from moisture and high temperature difference.
Protect an awning from shock or overload.
3.4.
Installation of the awnings frame
The installation must be in accordance with the requirements of safety, particular in health and safety
regulations. Use scaffolding or ladders that are in good condition. If the awning is not installed on the ground
floor but on the upper floors, it is recommended to mark up and protect the area below. Do not make
changes in the structure of the awning.
This manual assumes that the awning will be installed to properly prepared substrates and walls madeof
concrete clasy C20/25. In the event of an uncured floor screeds it is recommended to make the feet of the
Pergola. Foundation with dimension of 0.5 m x 0.5 m x 1.0 m (depth) to be made of concrete C20/25 .
3.5.
Qualifications of the installation team
Observe safety rules.
Ability to use of ladders and scaffolds.
Ensure transport and storage of the awning.
Experience in the use of tools and equipment.
Appropriate certificate of approval and use for fixing materials in construction.
Installation training at Dragon company (recommended).
Training the end user before using the awning.
Pass manuals and warranty on the end-user (Handing over protocol/Waranty).
3.6.
Fastening and pulling on the ropes
If you need to pull the awning in a higher level with the aid of ropes must one:
Take out from the packaging.
Transport ropes must be fastened so that the awning can not slip out.
Uniform load distribution (in horizontal position) during the pulling out.
3.7.
Required tools
Ladders/Scaffold,
Level,
Ropes,
Measuring tape,
Impact drill and drill bit (depending on the substrate),
Imbus (4mm, 5mm, 6mm),
Wrench/ringspanner (SW13),
Screwdriver and cross screwdriver PZ 1-3
page: 8 / 20