Green Gorilla ProLine Benutzerhandbuch - Seite 8
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Farbspritzgerät Green Gorilla ProLine herunter. Green Gorilla ProLine 20 Seiten. Industrial system
Pro31 Extension Assembly
Assemble wand extension to wand handle. Draw back spray handle trigger to
retract the shuto valve at the extension opening (as shown below in gures 7 &
8). Hold trigger in place and assemble the Te on seal and o-ring as shown in
gures 9 & 10.
Set Te on shuto at extension opening, while keeping the plunger drawn back
(as shown in gure 9).
Rest the o-ring on the Te on shuto , while keeping plunger drawn back (as
shown in gure 10)
Lastly, thread on the wand extension and securely tighten in
the clockwise direction (as shown in gure 11), and work the
spray trigger 2-3 times before nally releasing it. Tighten the
brass nut using a 13/16" wrench.
Pg. 7
g. 7
g. 9
g. 8
g. 10
g. 11