GREEN LOO Rota–Pod Installations- und Betriebshandbuch für den Eigentümer - Seite 5

Blättern Sie online oder laden Sie pdf Installations- und Betriebshandbuch für den Eigentümer für Toiletten GREEN LOO Rota–Pod herunter. GREEN LOO Rota–Pod 8 Seiten. Dry composting toilet

GREEN LOO Rota–Pod Installations- und Betriebshandbuch für den Eigentümer
5
Once you have found the right spot in the toilet room, either glue the Rota Pod to the floor using
silicone or similar – or drill 4 small holes through the edge of the bottom of the Rota Pod base and into
the floor – affix with suitable screws or fixings.
Drill the right size hole at floor level through an outside facing wall wall of the toilet to allow the
excess liquids drain hose to traverse. Attach the hose to the Rota Pod, using the supplied hose clamp
and feed through wall. Seal hole with silicone. Connect the hose to the absorption trench. Ensure there
is a natural fall on the drain hose!
Drill a suitable hole in the wall to allow the vent pipe to traverse through the wall. Suggested
installation drawing below (Please note that the drawing shows the optional moisture trap). After the
vent system has been installed, seal wall hole with silicone.