deconta C 25 L Gebrauchsanweisung - Seite 5

Blättern Sie online oder laden Sie pdf Gebrauchsanweisung für Water System deconta C 25 L herunter. deconta C 25 L 12 Seiten. Water management system

Instruction manual
Water Management Boiler system C 25 L

3 Volume of delivery

If no other agreements have been made, the scope of delivery of the water management
unit consists of:
 Water Management System
 Filter
 Instruction manual
Return delivery after termination of rental period
We have to insist on following conditions for the return delivery in order to protect our
clients and in accordance with the rules for hazardous materials transportation:
 As listed above
 Well cleaned (ready for use)
 Without binder remains
 Without damages
 Without filter

4 Technical description

4.1 Intended use

During asbestos sanitation works within closed rooms, you have to exclude that the
asbestos fibres leave the sanitation area uncontrolled and endanger the human health
and the environment. For this reason, personnel must leave the sanitation area through a
lock system and take a shower while leaving.
The deconta water treatment assumes the heating of the shower water and takes over
the filtering of the contaminated sewage water.

4.2 Unit description

This is an electric warm water storage for the heating of shower water. The desired outlet
temperature is reached by heating of the storage water (factory-adjusted approx. 37°C).
The produced shower water is pumped out and filtered.
Seite 5