KitchenAid KD-19 Series Installationsanweisungen - Seite 5

Blättern Sie online oder laden Sie pdf Installationsanweisungen für Geschirrspüler KitchenAid KD-19 Series herunter. KitchenAid KD-19 Series 5 Seiten. Built-in dishwasher

0
CONNECTING
HOT
2
WATER SUPPLY LINE
0
3
CONNECTING
DRAIN
LINE
Make aruin
fill llnr has been flurhd
dear of fonigr
matefioir.
Us9 compnssicxl
ell (furnished)
to connect
l/2"
0.0, copp
fill line to dlshw&ar
till valve. Make
sura fill Line hrr no sharp be&
(5" min. bend radius
#r-d)
that may product klnk
whi&
mi&t
tartrict
Watt
flow. Ccmneut fill lina to nm8t lo4
plumbing
wdes.
bmect
dishwasher
drain
to
mwt
local
plumbing
code. See suggxced installations
FIG. 4. See note for available drain accas-
ti@~-
0
4
CONNECTING
ELECTRICAL
POWER SOURCE
A--Remove junction box on dish&w.
B-install
appro~~I CoMector
(not furnished). C-Connect
powa cable white lead to whita lQbd and
black lead to black lead with adaquat~ insulation
or win nuEI ad
ground wire under gnen ground suvw or fug. Reinstall junction box.
When house wiring it aluminum, usa U.L. approved aluminum to copper
connectors.
The dishwasher
murt be properly
grounded
bafora operating
by
connecting
to a suitable ground wmplying
with National
EMcal
Code and/or local rhctrical
cods.
flG.
8
0
5
TESTING
INSTALLATION
Remove installation
&btir
from under dishwasher,
foam dmr
pads on each side and nbdr top
of tank,
and all internal
packing material and labels.
NOTE:
Do not remove white
plartic
glides on rides of door or bumpen
on corners of low
&.
Install
front
and lower
paneIt
per in&x-
tiort8
SuPPlied
with
p~tel
kiti.
Turn on
electrical
powwr
and water
supply.
Turn
ActJon
Indicator
clockwise
to
the
OfF
position
(Custom
and Imperial
models).
On
Supar@a and Patrician
models, pm
"C.ancel
Cycle"
button;
timer will advance to "OFF"
automarlcally.
Lift
door
handle.
Wait for
Tmer
to
Erut~matically
nst
itself
(neauary
for initial
installatiori
test of Superba only).
Then,
push
door
handle down to lock
msitian
md pm
"Normal
Cycle"
button.
Run dishwasher
through
d-16 complete
c~ch
to
make
ca-rlziin
It is oPOf8ting
FwoperlY.
Turn
off
electricA
power,
remove
lower
panel and check
for leaks. Reinstall
IoMr
panel and turn on electrical power.