HIKVISION DS-2CE16D8T-IT3 Benutzerhandbuch - Seite 7
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für DVR HIKVISION DS-2CE16D8T-IT3 herunter. HIKVISION DS-2CE16D8T-IT3 15 Seiten. Turret cameras turbo hd d8t series
Auch für HIKVISION DS-2CE16D8T-IT3: Benutzerhandbuch (15 seiten), Schnellstart-Handbuch (17 seiten)
6. Secure the junction box's body with supplied screws
on the ceiling/wall.
Figure 2-6
7. Route the cables through the bottom cable hole, or
the side cable hole of the junction box.
8. Combine the junction box cover with its body.
Figure 2-7
9. Repeat the step 5 and 6 of 2.1.1 Ceiling/Wall
Mounting without Junction Box to complete the
installation.
2.2 Installation of Type II Camera
2.2.1 Ceiling/Wall Mounting without Junction Box
Steps:
1. Paste the drill template (supplied) to the place
where you want to install the camera.
2. Drill the screw holes according to the drill template,
and the cable hole (optional) on the ceiling.
Note:
Drill the cable hole in the center of the drill template,
when adopting ceiling outlet to route the cable.
3. Route the cables through the cable hole (optional)
or the side opening.
4. Fix the camera to the ceiling with supplied screws.
Junction Box
Fix the Junction Box to the Wall/Ceiling
Fix the Junction Box Cover back to its
Figure 2-8
Body
Body
Drill Template
Screw
Hole