Avantco UDD1S Benutzerhandbuch - Seite 10
Blättern Sie online oder laden Sie pdf Benutzerhandbuch für Küchengeräte Avantco UDD1S herunter. Avantco UDD1S 17 Seiten.
User Manual
Changing CO
Follow these instructions at ALL times when you replace a CO
1 . Close cylinder at A .
2 . Remove tap D from keg . Pull pressure release ring on body of tap to release pressure
remaining in line . (do not close C)
3 . Remove or loosen regulator key B by turning counter clockwise .
4 . Remove regulator from used cilinder at E .
5 . Remove dust cap from new gas cylinder at E and clear dust from outlet by opening and closing
valve A quickly using appropriate wrench .
6 . Attach regulator to new cylinder at E . (use new fiber/plastic washer, if required) .
7 . Open valve A all the way .
8 . Close valve C .
9 . Adjust regulator key B by turning clockwise to set pressure . (check setting by opening C
and pulling and releasing the ring F on the pressure release valve on the body of the tap) .
10 . Tap keg at D with valve C open .
Note: DO NOT drop cylinders. DO NOT lay cylinders flat.
It requires 1/2 lb. of CO
with 15 lbs. of pressure on barrel.
Pressure Adjustment on CO
Increasing Pressure:
1 . Close regulator shut-off C .
2 . Turn regulator key B clockwise and make setting .
3 . Tap gauge for accurate reading .
4 . Open regulator shut-off C and draw beer .
Decreasing Pressure:
1 . Close regulator shut-off C .
2 . Untap keg at D and activate tap handle to
bleed line . Leave in open position .
3 . Slowly open regulator shut-off C and
simultaneously turn regulator key
counter-clockwise to zero reading .
4 . Close regulator shut-off C and set pressure by
turning regulator key clockwise . Check setting
by opening and closing valve C .
5 . Close tap head D . (put in OFF position)
6 . Tap keg at D and open regulator shut-off C .
Gas Cylinder
2
to dispense 1/2 barrel of beer at 38°F
2
gas cylinder .
2
Regulator
2
(May vary based on regulator design)
- 10 -