CORNING MRU Montage Installationshandbuch - Seite 3

Blättern Sie online oder laden Sie pdf Montage Installationshandbuch für Messgeräte CORNING MRU herunter. CORNING MRU 12 Seiten. Mid-power remote unit outdoor enclosure mimo

3.

PRE-INSTALLATION PROCEDURES

Step 1:
Remove each rack ear and reassemble according
to position shown in Figure 1.
Step 2:
Carefully lay cabinet on backside so door faces
upwards.
Step 3:
Referring to Figure 2 for relevant knockouts,
use appropriate knockout tools to punch out
knockouts for routing connection cables.
Note the following:
• 2.469-in dia. knockouts — for RF and power
• 1.375-in dia. knockouts — for fiber and power
ATTENTION! In the event that a power amplifier (PAM) or the
optical module (OPTM) needs to be removed
from the chassis, make sure to first press the
release button on the module and then pull out
using the handle (see Figure 3). Any attempt to
pull out the module without first releasing may
cause damage.
Corning will not be liable for damage of products
resulting from improper handling during
installation or repair.
Corning Optical Communications
cables; front pair for power and RF and rear
pair for power and RF
(if power cable diameter is too small for the
large knockouts)
Figure 1. Required Position of MRU Rack Ears
Figure 2. Required Knockouts
Figure 3. Extraction of PAM/OPTM
Quick Installation Sheet | CMA-595-AEN | Page 3