CORNING ONE GX Handbuch für allgemeine Informationen - Seite 10

Blättern Sie online oder laden Sie pdf Handbuch für allgemeine Informationen für Messgeräte CORNING ONE GX herunter. CORNING ONE GX 12 Seiten. Higher power 40 w dual-band wcs/2.5 ghz tdd das remote
Auch für CORNING ONE GX: Schnellinstallationsblatt (14 seiten)

12B. POWERING UP DC MODELS
IMPORTANT! Verify the following before connecting
DC power cable:
The following additional elements are required (ordered
separately):
• DC power supplier must be turned off before performing the
power connections!
• DC cable supports required voltage and current specifications:
– -40 to -57 VDC and 27.5 A maximum
– Maximum power consumption: 1100 W
• DC cable diameter range between 7 to 14 mm
• Cable lug specs:
– Hole size: 1/4-in
– Hole spacing: 5/8-in
Step 1.
Open DC power chamber by loosening the four
M3 screws. See Figure 15.
Step 2.
Referring to Figure 16, remove retaining nuts
and route power cord through provided tubing
gaskets noting the following:
– Tubing gasket is required for power cord
– Tubing gasket is not required for power cord
Step 3.
Carefully let power cord enter the chamber
(through hole) and connect the lug to terminal
(make sure right DC polar is connected).
Step 4.
Tighten remaining nuts.
Step 5.
Tighten lug to terminal with nut and washer
(Figure 17).
Step 6.
It is strongly recommended to secure the power
cords to the enclosure. Additional holes are
provided for this purpose. See Figure 18.
Corning Optical Communications
diameter in range of 7 to 10 mm
diameter in range of 10 to 14 mm
Figure 15. GX Quad-Power Connector
Figure 16. Routing DC Power Cords
Figure 17. Tightening Lug to Terminal
Figure 18. Securing Power Cable
Quick Installation Sheet | CMA-600-AEN | Page 10