CORNING ONE MxU Schnellinstallationsblatt - Seite 6
Blättern Sie online oder laden Sie pdf Schnellinstallationsblatt für Messgeräte CORNING ONE MxU herunter. CORNING ONE MxU 8 Seiten. Mid-power expansion unit
8.
VERIFY NORMAL OPERATION
Step 1:
Verify that fans are operational.
Step 2:
Refer to status LEDs on front panel to confirm
normal system operation according to Table 2.
LED
PSM-AC/DC) PWR/STS Steady green:
RUN
SYNC
STS
MGMT RJ45 Port LEDs
Table 2. Status LED Descriptions
Corning Optical Communications
Description
Power supply module power input OK
Red:
Faulty power input
Blinking green (1 sec.): Module software is running and operational
Rapid blinking green:
"Identify" feature has been enabled via the management GUI
Off:
No power inpout detected
Steady green:
TDD sync locked
Steady red:
TDD signal out of sync
Steady green:
Normal operation; Overall status ok
Steady red:
Indicates generated alarm in unit
Blinking red:
"Over temperature" alarm active; Indicates temperature has
exceeded threshold (with door open)
Note: Temperature alarm is set as first priority and overrides any
other alarm indication.
Blinking green:
Ethernet connection to MRU OK
Quick Installation Sheet | CMA-597-AEN | Page 6